Operation MetaForum

 The realisation of a complex design such as that of MetaForum (Eindhoven University of Technology) obviously requires a great deal of creativity from those who build it. General contractor Hurks did an excellent job at installing the new steel structure and filmed this process. The short film shows the long slender columns being inserted into the existing structure of the W-hall, the transportation and placing of the enormous steel girders, and the installation of the concrete floor slabs. By now the building has almost reached its full height. The actual state of the project (projected completion summer 2012) can be seen on the webcam.

You are here

On 25 November, project architect Erik de Geus presented the final design for the Zernikeborg; the new, i »

At the 4th and 5th of July, Utrecht will be dominated by the Grand Départ of the »

The construction of the Center Court on the Brightlands Chemelot Campus in Geleen can be followed by a »

The education centre for students and teachers of the faculties of Science, Geosciences and Biomedical Sciences of Utrecht University – named after »

CHEOPS, the association for engineering students at Eindhoven University of Tec »

The construction of the Center Court on the Brightlands Chemelot Campus in Geleen goes fast. »

Rotterdam

The new education centre for the faculties of Science, Geosciences and Biomedical Sciences at Utrecht University, designed by Ector Hoogstad Archit »

On 25 November 2015, the University of Groningen unveiled its design for »

After a very intensive design process Ector Hoogstad Architecten has completed the definitive design for a new laboratory complex for the Department of Applied Physics of Delft University of T »

Contact

Ector Hoogstad Architecten

Visiting address The Netherlands
Laanslootseweg 1
3028 HT Rotterdam
The Netherlands

Postal address The Netherlands
Postbus 818
3000 AV Rotterdam
The Netherlands

T +31 (0)10 440 21 21
E info@ectorhoogstad.com »