November 2011 The realisation of a complex design such as that of MetaForum (Eindhoven University of Technology) obviously requires a great deal of creativity from those who build it. General contractor Hurks did an excellent job at installing the new steel structure and filmed this process. The short film shows the long slender columns being inserted into the existing structure of the W-hall, the transportation and placing of the enormous steel girders, and the installation of the concrete floor slabs. By now the building has almost reached its full height. The actual state of the project (projected completion summer 2012) can be seen on the webcam.
May 2013 Orion, the new educational facility for Wageningen University and Research Center, designed by Ector Hoogstad Architecten, is now operational. » Read more
April 2013 MetaForum is one of three projects nominated for a Golden Phoenix Award in the category "transformation". » Read more
March 2013 Orion, the new central educational facility of Wageningen Uni » Read more
March 2013 Mrs. » Read more
March 2013 Mayor Van der Laan (central in the photo) and Aldermen of Amsterdam recently chose the new Matrix VI building at Amsterdam Science Park (ASP) as location for their regular meeting. » Read more
February 2013 Two projects by Ector Hoogstad Architecten are in the running to become BNA Gebouw van het Jaar (building of the year) 2013: MetaForum, the new central building of Eindhoven University of Technolog » Read more
February 2013 Recently Matrix VI in Amsterdam, designed by Ector Hoogstad Architecten, was » Read more
February 2013 At the moment we are working very hard on the design of the Montessori Child Center in Dordrecht. » Read more