The construction of Orion, the new - second - main building for Wageningen University and Reseach Center ( » Read more

Contact

Ector Hoogstad Architecten

Visiting address The Netherlands
Laanslootseweg 1
3028 HT Rotterdam
The Netherlands

Postal address The Netherlands
Postbus 818
3000 AV Rotterdam
The Netherlands

T +31 (0)10 440 21 21
E info@ectorhoogstad.com

Ector Hoogstad Architecten China
Dutch Design Workspace
3rd Floor, Building 3,
600 Shaan Xi Rd (N)
Jingan District, Shanghai,
China, 200041 » Read more

Matrix VI Amsterdam Science Park

On the Science Park Amsterdam, Matrix VI is being built: a flexible building that provides a combination of laboratory and office space. The Matrix Innovation Center (n.v.) operates multi-user buildings here for existing or start-up businesses in ICT, Life Sciences and new media. At just a stone’s throw from the University of Amsterdam’s new Faculty of Science, Matrix VI not only offers the most advanced facilities for start-up chemical and biotechnology companies, but also facilities for the whole Matrix community, including refreshment areas and conference rooms on the ground floor. Matrix VI will be a flexible building: a floor can be subdivided into small units, but businesses can also rent a half or whole floor. On the top floor, it is even possible to set up cleanrooms or heavy chemical labs.

Sustainability is a key theme in the design. The design of the facade combines the desire to maximise daylight entry and the view and, at the same time, to prevent warming from the sun as much as possible. The parapets will protrude further, depending on the orientation of the facade, and serve as an awning in this way. Vertical glass blinds with screen printing on the east and west facade will also deflect the low morning and evening sun. In this way, sun screening is not at the expense of the view and diffuse daylight entry. Sustainability was also a decisive factor in the choice of materials. The closed facades will be cladded with, for example, thermically modified timber that is unsusceptible to rot. The extensive technical installations will be kept out of sight under a partially sloping moss sedum roof, which acts as a buffer against rainwater and also filters fine particles from the air.

Together with advisers IMd (structures), Mobius (building physics) and Deerns (installations), an intelligent and integrated building design was made, which was elaborated in full with the assistance of BIM. Expected completion is late 2012.

5.970 m2, 2012

In the heart of Technopolis in Delft Zuid, opposite the Reactor Instituut Delft, the new TNW building is rising. » Read more

Orion is the second central academic building on the campus of Wageningen University & Research. » Read more

Since the nineteen-nineties, our practice has been closely involved with the renovation of the University of Twente. » Read more

Amgen is an American company that develops and produces bio-technology based drugs. Because of the explosive growth the company is experiencing expansion was necessary.
» Read more

De Uithof is metamorphosed into a Mecca of contemporary architecture. » Read more

You are here