Contact

Ector Hoogstad Architecten

+31 (0)10 440 21 21
info@ectorhoogstad.com

Hofplein 20, 24th floor
3032 AC, Rotterdam NL
Postbus 818
3000 AV Rotterdam NL

Business Development

bd@ectorhoogstad.com

Public Relations
pr@ectorhoogstad.com »

Milestone for Delft University of Technology

After a very intensive design process Ector Hoogstad Architecten has now completed the definitive design for a new laboratory complex for the Department of Applied Physics of Delft University of Technology. The building contains over 30.000sqm of floorspace containing very sophisticated laboratory facilities for the departments of Bionanotechnology, Chemical Engineering and Biotechnology. The building will be built at the crossing of Kluyverweg (that will be freed of all traffic and turned into a prak for reasons of avoiding vibrations) and Mekelweg, across the road from the Reactor Institute Delft.
The building is composed of two wings, each surrouding a courtyard, that are joined by a central space that also holds two entrances; one to the north and one to the south. This four story high central hall is the building's main traffic junction as well as it's social hart. A straightforward facade maximizes transparency and acts as a simple frame for optimal interaction between inside and outside: occupants can fully enjoy the attractive green surroudings, whilst passers by are allowed a view of the hightech interior.
Central to the design is an effort to combine flexibility and future value with the possibility of creating very specific local facilities or conditions such as low-vibration floors, dustfree environments or extremely stable air temperatures. In close collaboration with the building's future occupants a building structure was designed that most economically creates the conditions for top level scientific research, today and in decades to come. Delft University of Technology has already approved of the plans. Next step in the process is the selection of contractors, together with whom the design will be futher developed and realised.

You are here

In the presence of Minister of Economic Affairs Kamp and mayor Lenferink of Leiden, the Biotech Training Facility was opened. »

Ector Hoogstad Architecten is selected by De Haagse Scholen to design a new building for the Annie M.G. »

On 25 November, project architect Erik de Geus presented the final design for the Zernikebo »

On 19 November 2015 State Secretary Sander Dekker (OCW) and ARPA-E Director Ellen Williams officially opened the n »

On September 4 a ‘Leonardo da Vinci helicopter’ lifted a flag to the highest point of the new Da Vinci College. »

Ector Hoogstad Architecten is invited to design the new Hyperion Lyceum in Amsterdam. »

Each of the three floors of the energy neutral building is customized to house the various education clusters for language, science and social studies education. »

The 30.000 square metre Faculty of Applied Sciences in Delft contains a wide range of educational and laboratory facilities for the departments of Bio-nanotechnology, Chemical Engineering and Biote »

Located next to the river Maas, this sustainable, multi-functional secondary school offers some amazing views of the dikes and flood plains. »