Contact

Ector Hoogstad Architecten

+31 (0)10 440 21 21
info@ectorhoogstad.com

Hofplein 20, 24th floor
3032 AC, Rotterdam NL
Postbus 818
3000 AV Rotterdam NL

Business Development

bd@ectorhoogstad.com

Public Relations
pr@ectorhoogstad.com »

Milestone for DIFFER

After a nocturnal transportion the steel lattices of the north facade of the new building for DIFFER have arrived at the construction site on the campus of Eindhoven University of Technology. The transportation took place at night because contractor Dura could only move the middle part (27 meters) of the 45 meter construction by temporarily closing of several intersections and removing obstacles like barriers and streetlights. Meanwhile – even more quikly than expected – the the parts have all been assembled and put into place, revealing an important part of the building’s outline: you can now get a first impression of the dramatically cantilevered north corners of the building mass. The construction of the 12.000 sqm research and office building for the Dutch Institute For Fundamental Energy Research is progressing posperously and will, according to the schedule, be completed at the end of the year.



You are here

The first phase of what is to become the world’s largest bicycle parking garage at Utrecht Central Station was opened for the public on Monday morning 7 August at 5am. »

On 25 November, project architect Erik de Geus presented the final design for the Zernikebo »

On 19 November 2015 State Secretary Sander Dekker (OCW) and ARPA-E Director Ellen Williams officially opened the n »

For the station area of Utrecht, Ector Hoogstad Architecten designed also an HOV overpass. »

At the 4th and 5th of July, Utrecht will be dominated by the Grand Départ of the »

The construction of the Center Court on the Brightlands Chemelot Campus in Geleen can be followed by a »