Contact

Ector Hoogstad Architecten Paris

+33 (0) 1 73060394
info@ectorhoogstad.com

14 Rue de Dunkerque
75101 Paris, FR
»

Opening Montessori Child Center Mosaic

On October 15th alderman Bert van de Burgt took care of the grand opening, together with students of the Montessori Child Centre Mosaic in Dordrecht. The building has room for two fused primary schools, a nursery, a play group and after-school care. On the occasion of the official opening of the new school this Libdub has been made.

You are here

Ector Hoogstad Architecten is selected by De Haagse Scholen to design a new building for the Annie M.G. »

On 25 November, project architect Erik de Geus presented the final design for the Zernikeborg; the new, i »

On September 4 a ‘Leonardo da Vinci helicopter’ lifted a flag to the highest point of the new Da Vinci College. »

Ector Hoogstad Architecten is invited to design the new Hyperion Lyceum in Amsterdam. »

At the 4th and 5th of July, Utrecht will be dominated by the Grand Départ of the »

The construction of the Center Court on the Brightlands Chemelot Campus in Geleen can be followed by a »

The 30.000 square metre Faculty of Applied Sciences in Delft contains a wide range of educational and laboratory facilities for the departments of Bio-nanotechnology, Chemical Engineering and Biote »

Located next to the river Maas, this sustainable, multi-functional secondary school offers some amazing views of the dikes and flood plains. »

The new building Polaris will strengthen the far-reaching civil and military integration between Air Traffic Control the Netherlands – LVNL – and the Dutch Airforce. »