November 2011 The realisation of a complex design such as that of MetaForum (Eindhoven University of Technology) obviously requires a great deal of creativity from those who build it. General contractor Hurks did an excellent job at installing the new steel structure and filmed this process. The short film shows the long slender columns being inserted into the existing structure of the W-hall, the transportation and placing of the enormous steel girders, and the installation of the concrete floor slabs. By now the building has almost reached its full height. The actual state of the project (projected completion summer 2012) can be seen on the webcam.
February 2016 On February 4th the new faculty building for Applied Sciences in Delft is completed. »
December 2015 On 25 November, project architect Erik de Geus presented the final design for the Zernikebo »
November 2015 The Victor J. »
July 2015 At the 4th and 5th of July, Utrecht will be dominated by the Grand Départ of the »
May 2015 The construction of the Center Court on the Brightlands Chemelot Campus in Geleen can be followed by a »
April 2015 The education centre for students and teachers of the faculties of Science, Geosciences and Biomedical Sciences of Utrecht University – named after »
March 2015 CHEOPS, the association for engineering students at Eindhoven University of Tec »
March 2015 The construction of the Center Court on the Brightlands Chemelot Campus in Geleen goes fast. »