Contact

Ector Hoogstad Architecten

+31 (0)10 440 21 21
info@ectorhoogstad.com

Hofplein 20, 24th floor
3032 AC, Rotterdam NL
Postbus 818
3000 AV Rotterdam NL

Business Development

bd@ectorhoogstad.com

Public Relations
pr@ectorhoogstad.com »

OWC University of Utrecht

The Preliminary Design of the Noordwestcluster Education Centre ( Onderwijscentrum Noordwestcluster - OWC), commissioned by the University of Utrecht, has been completed by Ector Hoogstad Architecten, together with Pieters Bouwtechniek (Structural Engineering), Valstar Simonis (MEP) and Cauberg-Huygen (Building Physics). The new educational facility, containing labs, study landscapes, classrooms and office/lounge spaces, will become the work environment of the University of Utrecht Geo- and Beta Science Faculties staff, scientists and students. The design is based on the results of multiple workshops with the prospective users to achieve an optimal response to their requirements and desires.

The new building consists of two elements: a tower with the labs on the top and self-study landscapes and common spaces underneath. This area connects to the other new section of the building; the 'loop' (promenade), connecting the new tower with the Buys Ballot building and the Minnaert building and containing uses as auditoriums, study areas and restaurants. The renovation of the Minnaert building is included in the brief as well.

Sustainability is a focal point of this design. The transparent cladding is thoughtfully equipped with exterior shading to achieve an optimal balance between daylight penetration and energy performance. Due to this and other sustainability measures like solar panels and careful material choices this lab building will eventually become eligible for BREEAM 'very good' certification.

Currently the Definitive Design is in an advanced stage. According to the schedule the construction will start in the summer of 2013. Completion is scheduled for the 1st of December 2014.

You are here

In the presence of Minister of Economic Affairs Kamp and mayor Lenferink of Leiden, the Biotech Training Facility was opened. »

Ector Hoogstad Architecten is selected by De Haagse Scholen to design a new building for the Annie M.G. »

On 25 November, project architect Erik de Geus presented the final design for the Zernikebo »

On 19 November 2015 State Secretary Sander Dekker (OCW) and ARPA-E Director Ellen Williams officially opened the n »

On September 4 a ‘Leonardo da Vinci helicopter’ lifted a flag to the highest point of the new Da Vinci College. »

Ector Hoogstad Architecten is invited to design the new Hyperion Lyceum in Amsterdam. »

The competition for the renovation of the Collège Jacques Ellul as part of the Bastide area redevelopment, invited participants to imagine a new form of school, that takes into account the ongoing »

Each of the three floors of the energy neutral building is customized to house the various education clusters for language, science and social studies education. »

The 30.000 square metre Faculty of Applied Sciences in Delft contains a wide range of educational and laboratory facilities for the departments of Bio-nanotechnology, Chemical Engineering and Biote »